My new ride, Fraelsi

My new ride, Fraelsi
Fraelsi means Freedom in Farose

Tuesday, November 01, 2011

Roof is done

And I am so pleased with the new metal roof, the new dormer and the stairs. I have a lot more work to do before my new attic space is done but will have it usable soon and stuff moved in/up there and settle in for the winter. Almost all the insulation work is done and I will soon be putting osb up on the walls of the storage space under the eaves. It will take a while to build in all the storage cubbies I will have, and the dolls have their own nook too. And I will make a dedicated space for that over-sized dog I have. Where he can watch out the east window. Soon I will be planning out that second bathroom, know where it goes, but not size or how I am laying out the toilet, sink and shower. It does get a glass pocket door and will face the new east window but is off set from it so it will be about impossible for any one outside to see into that bathroom unless they are up a ladder and against my new window. The house feels cool, furnace is set at 70 and temp on the thermostat has 72 for room temp. The dryer is running, Ben must have done laundry late and put clothes in not long before I got home from work. The attic or upstairs is warmer than downstairs right now. I do have thermometer up there but need a good digital one and set in the northeast corner as that should be the coolest spot. It will take several years to know what my utility costs will average or be as they will keep changing as I get more done here. I am not running the dehumidifier now and it used to run most of the time to dry out this house from the leaking roof problems. But I have gained a lot more space so that will cost to heat. I have less drafts in some places but I did not get the north bathroom window pulled and a new one put in so that is still going to be a cold and draft problem this winter but have plans to be doing it as soon as weather warms up in the spring. Even if we have a warm spell before hard winter sets in, I won't have enough done to move every thing out of the bathroom that has to be moved out and tear out the old window, have Pat help put in the new one and then get things closed up, replaced/repaired and so forth so I have the bathroom back in usable and tolerable order. Maybe by spring I will have my upstairs bath usable and the one here on the ground floor ready for new window, move the tub, move the door to laundry area...dream on, not sure where funds will come from but there is hope that small claims court gains me back most of the deposit from C.L. Campbell Construction as they did default on the contract. Well, I need to get something to eat and then tuck me into bed, know I will be busy before work, lots to do, including clean up outside from the construction, figure where to store the left over metal as most of it will end up on the porch roof as soon as I can afford to buy what else is needed and pay for the labor, and get back on Pat's work list. He will also frame in the new bathroom once I have it planned out and know how big and where exactly those walls need to go. And the new space gets a 40" flat screen to go with the new sofa and Jake's x-box. Momma is going to hide up there and watch Star Trek and silly girl movies this winter and play with her dolls and yarns.

Friday, October 21, 2011

That attic space

I know it will be a long time before it's totally finished, but I will start using it as soon as I can. I love the fact that no windows face the busy street in front of my house, I can feel I am hidden away when I am up there. I do love having Jake home and Krisda is great to have here but I am so glad they are in MO for the weekend and the dog, birds and I have our usual after work quiet house. And I could go over to Larry's and he'd be glad to have me there but I just want to be here, and have Kid in the house, instead of outside on his chain, breath the air here, no cats or carpet or furnace noises. It wasn't too long ago that I had a furnace in the bedroom and loud but it moved to the new utility area and I have gotten used to a much quieter house and Larry's trailer has the furnace close to his bedroom so it is much louder. The house is cool but that is the dormer and attic under construction stuff and it will start to improve as I get insulation in and when Pat gets that dormer closed in, the window are is framed but the window is not installed yet and there's a lot yet to be closed up on the east side of that dormer, plenty of fresh air right now, cold fresh air. I will have to make insulated curtains for the south and east windows before spring comes or they will be real heat problems but I will sure enjoy the passive solar gain this winter. I do need to close off the cold though so will be working on those curtains once I have the rough work done up there and can start using my new area. I did my wellness stuff on line for our work insurance updating and think it's stupid and computer generated that does not give a true picture of the real person or the real life. I have a lot of pain, ya, and there is no place to enter the accident and foot damage or the fact that my hands have carpal tunnel and are getting old. I have a lot of stress and there is no place to put in the why of that stress, old house with no real roof, winter coming and no way to heat the open house, a lot of money paid to a very dishonest contractor and now waiting for small claims court. It would be abnormal to not have some stress and depression over the roof situation or my pain that the car accident has created and that I will live with the rest of my life. It's like asking if I have a lot of headaches, yes but it's not the same as other people-unless they have my allergies and sinus problems. I rarely have stress headaches, or non car accident related pain, other than my hands. So, the on line questions do not really give a clear picture of me and of my pain or depression or my life. And it's really OK to be just ok, not happy, but ok, content, at peace, mellow. And it's ok if I am comfortable alone and like living alone. I see people every day I go to work and I what I feel is a good relationship with the guy I date but I don't want to live at his place, he sure doesn't want to move here and his cat is NOT welcome to move here, my dog and birds will not be moving to his place. I have plenty of 'support system' and don't need to give out names and contact information, I really do not need to be reported on or bugged by my on line, company medical stuff. I will just continue to handle my little life and the details in that little life.I do check my blood pressure and I will add in the other stuff, like when I had my last pap smear, I don't remember when, ok, so it was probably last January but I sure don't know the exact date. Washer is almost done so I can toss that load into dryer and have it going, I had to replace the light bulb in the laundry area, the first time I have had to do that since I put that light fixture in. So, as it's a vanity bulb, it had to be1 that was remove when we gutted the original bathroom. I guess I won't complain about a lightbulb that lasted 6+ years and I did have a replacement so that's been done and I can see to load the washer or dryer in the night. Better get this saved or posted and head to laundry space and then bed, I do want to work in the attic before I go work at Cargill for overtime.

A quiet house again

It's great to have Jake and Krisda here, but it's been busy and loud. Today, they, with Ben headed west to MO to visit for the weekend and I get to clean house a bit, maybe go to a yard sale, go to work and just enjoy the quieter house for a while. The construction work is going ok, not as fast as I would like but the metal roof should be going on starting Monday, I have a lot of the insulation bought and here, and will buy more Sunday while I am in Springfield and it looks like we will have dry weather for a week or so and I plan to start insulation work while the kids are gone and also prime some of the osb that will be going over that insulation in the storage areas so I can get those closed off as soon as I can and the attic starts getting more usable and warmer. The dormer is close to done, the window is waiting and I will be glad to see that dormer done, the stairs assembled and quit using a ladder to get in and out of my new attic space. Work is going ok, foot is doing better with the brace and I will look at taking it back in to Hanger for some tweaking with the fit soon. I needed time for it and me and the new, 1/2 size larger work boot to adjust and we are about to that place. I take the kids back up north to Krisda's dad the 27th and had planned a crafting thing at the local library but won't be able to attend. Jake needs a day or so with her family before this deployment and this time instead of storage at base, his stuff came home and I will be tucking it up in the attic on the south end in some of that new storage area we will have. I don't know when I will be going to court with the contractor that did not do the work he agreed to and took a large deposit on but expect sometime the middle of November for that and hope to get back a large amount of that $$ but won't plan to put it into the bathroom upstairs until I actually have that money. So, it's getting cold and I don't like that but sure like all the sun through the south attic window. It will be a long time before the entire area is done, bathroom is high on the list but hope by tax time to look at contracting out the drywall work and see that done and paint when spring comes.

Wednesday, October 12, 2011

Old House progress

the carpenter is making good progress on getting the west side of the house ready for the metal roofing, rain is now slowing down work but he's here when he can be on the roof. And Ben helped me with the start of framing in a small short closet/hanging area in the south west part of the attic. I still have the support to put in the south east side, that area will be a 2 'x14' doll display area once done. And I have a couple more studs to put in along the west wall, will get them done this week and also hope to start insulating and closing up the west eaves, once the carpenter gives me the 'go ahead'. The dormer will be built as 'shed' or lifted roof, 1 clean line that will have no seams to later leak. It will give me a lot of east light with the new window, enough headroom for the spiral stairs and will look nice and not tacked on. I want the house to end up with a lot of nice curb appeal and be comfortable to live in, and work for me, meet my needs and be easy to care for, and low maintenance over time. I have not been able to 'see' the sewing/work space yet but will as I get more work done and get the tools and supplies out of that area. It will take months to get all the work done and I don't know how much of my deposit with the contractor will be returned or when, I expect to be in small claims court in mid-November. Those funds will go into the work here once I get them but am not counting on spending the money until I have it in hand. It's not a perfect life and I will always have pain and problems with my foot from that accident, and I will be dealing with the emotional issues probably that long. But I'm not having the amount of depression I was 6 months ago.

Tuesday, October 04, 2011

That new Boot

 
Posted by Picasa


this is that new support boot I am starting to really like. It will barely fit in 1 pair of my steel toed work boots, big toe is rubbing on the end of that steel toe but new ones, same style, 1/2 size larger are ordered and Cargill pays the full price for up to 2 pair of work boots per year for me, nice.
It is making a difference, but my left hip joint hurts more. I think as my body adjusts to the boot, and I get a larger work boot, that hip pain will reduce. I know I walk with more balance and closer to the pace I walked at before this accident and I no longer feel ugly and clumsy and 'gross' and that is a huge plus.
A huge improvement in my life, both at work and home, I am not in as much pain and I am not as tired.

Sunday, September 18, 2011

Love the lawyer's letter

got my copy yesterday, nice, polite and to the point, and has a 7 day period from date of letter, not date received for work here to start or we look at my options, including legal ones. Now, we know legal ones are just what I am going to do. And mean, nasty and tough is just what I will be, with a lawyer known for that also. In the meantime, I cannot find the notebook with my doll knitting patterns anywhere, did reprint some out but ran out of printer ink. My bed is piled high with stuff that I got out to look for patterns, move stuff, move stuff, and pile on my bed. If the contractor had done the work, which I did pay a hefty deposit for, in a timely, like he promised, in writing manor, I would not have a bed piled with stuff, I would have a workspace in that attic studio, it might not have built in shelving yet but it would have my sewing/knitting/doll stuff up there. The bathroom would not have a chest of drawers in it, and more doll/sewing stuff. My living room would not have a huge antique chest of drawers in the way. And I have cleaned and dealt with the mess, and worked up in that attic space for months, have stuff now in rented storage and will have it there for another month at least. So, I won't get happy with this contractor, will be getting a inspector to come do a report on the very little work that has been done by CL Campbell Construction and what heeds done to do what I want and have a contract for, right. And that is how they can do it or face court action and not get paid any more. If work is not started and kept going until they are done, I do plan court action. I also will be deducting some of the costs their delay has cost me, like how long the roll off disposal bin has been here, the 2nd month of storage fees for my stuff and the costs of a lawyer. After all, to do the job right, they had to do a new contract and raise the price $2000. It's only right that they get my costs for their choice of delaying this job. And if there is any damage from rain, it becomes their costs also, as they removed the roof, and did not get it re-roofed in a timely manor. That law here and they do know it. I would be interested to know if the senior partner has been aware of all the issues here or if dad was kept in the dark. But he was here 8/31 and so should have kept tabs and kept the work going then. I won't get happy just because they get the job done, they don't know me, if it's not done right, if it's not done in a very timely manor I will take action. And if it's not started within that 7 day period on the letter, it's legal action. And since our plant works Saturdays, I do expect If they get back to work here, they work Saturdays until the job is done and expect the job to take less than 2 weeks. In the meantime, I have a doll club meeting today, need a shower and need to take Kid with me to go buy a length of log chain to fasten him to the tree while I am at work or gone, as he's broken the cable, broken the new dog chain I just bought yesterday. There are rodents in that damn roll off and he wants to go play there and hunt them out. The same roll off that should have been out if this yard by late July so another reason for me to be displeased with the damn contractor.

Thursday, September 15, 2011

have a Lawyer, letter going out


today to the contractor. and lawyer says I have done very good at keeping things in order, and on the right side of the law. Letter first and very limited time for contractor to get the job done and done to my satisfaction. We will go to court very fast if need be and won't spend much time going back and forth with contractor.
That is good news and my purple sweater is done and looks great, the furnace is turned on and needed, the sun is out and the new doll trunk arrived and my resin Goodreau fits nicely along with his clothing and shoes. I do need some hangers that will fit in the case but it sure beats the cardboard box he came in.
Work stinks, but that is due to a change in the area the cleaned equipment is sorted. It's a longer walk, and tight corners, cold and damp so yes, I am in a snit, and it's taking longer to do those racks and also wash the mesh gloves during the same time frame. I am NOT going to go back and forth between the 2 areas. I will work a rack and when it's done I haul it up and park it close to where the mesh wash room is, do some mesh and then haul the rack on through the cafeteria and to where it goes.
I will adjust and adapt, my work load has increased and I am in a snit and will not get happy about it, nor will I be concerned if I am working overtime, not my decision to dump me with a larger work load.

Monday, September 05, 2011

fed up with working on the attic project


I need to get some help and put down the last of the sub floor, but I am taking a break before making any phone calls for help, I am just really tired of this attic project, it's been on going since mid June, contractor has delayed and delayed, started job and then left it for 2+ weeks. Now it's September and still not done, it's getting cool nights and I still don't have that area insulated even.
Ben's not been good help, some hired help was a joke, a rather expensive joke, Dean from work is good help but I know he had plans for this weekend so won't call. Otto will come help and together we will manage the center section on the south end. It will be the hard spot now, and first piece is lined up and will take 2 people to get it to lock up the tongue on this sheet with the groove on the one it has to go into.
But I have almost every thing into storage that needs to go, and have most of the clean up done and we have close to 3/4 of the sub floor down.
It's a different Labor Day than last year, that was recovering from my accident and dealing with ending a relationship before it cost me far more $$ than it already had.
And 2 years ago, it was single and battling weeds in the garden, and trying to get the budget tighter to get through the winter and come out with less debt load.
I'm ok with most of where my life is at this year, this time but this new roof/attic conversion has really gotten to be stressing, and most of that stress is a contractor.
I will survive, the house will get a metal roof, I will get my attic studio area and the debt load has shrunk some in the past year.
I have made a lot of recovery from that auto accident, have moved on with my life, not dating any lying, debt ridden men now, and not dating any who play head games.
I still have a garden full of weeds, and a yard and flower beds that burnt up this summer with all our heat and my neglect.
I will always have a small old house that needs work but I am ok with that most of the time, and now it's time to get back to work on that damn attic job.

Sunday, September 04, 2011

slow progress but at least the job is going again


Apparently my call and willingness to get a lawyer about this roof job got action, including the senior partner to become aware of what was or rather was not being done on this job. Now the entire roof has been stripped and decked and this time all the clean up outside was done and I was not left with a mess and tarps and trash around.
I am photographing and documenting as things go or don't get done here, and will not hesitate to make a few phone calls and yes, a lawyer if need be.
I have storage unit rented and am getting all my stuff out of the attic and stored while the job is being done and do not plan to have storage rented for more than 1 month, 2 if I am waiting on drywall/painting job to get finished.
It's hard to believe all the stuff I have had tucked away and stored in that attic all these years, not much trash to toss out, not much needs sorted before stored but I am doing some cleaning and will clean and oil my antique rockers and such before they are stored.
Larry and I had a good day up north, Colchester and huge flea market and I came home with another rocking chair that needs both back and seat re-caned. It is very similar to the one I just finished the back on, they will look good together in the new attic space.
We had rain in the night and early morning so it's cooled down and the attic is comfortable working in. Right now I am working alone but will get Otto's help when I am ready to get the bigger items down out of the attic and haul them to the storage unit. I think 1 have about 3loads to go but I am also taking some of the stuff that's in my way on the ground floor too.
I need to get sub floor down, most is done but have the south east section left to do and might even get some down today. I am off work and paid tomorrow so can do it then if I don't get to it all today.
I will never give C.l. Campbell Construction a good reference, they might do good work and reasonable costs but the delays and bull shit I have had to deal with already make a company I would not wish on anyone. No one deserves to have a job jerked around and be left with the mess and roof open for several weeks at a time like I have been here.
But I will have a blue metal roof, and as soon as I can, will be doing the wiring and insulation work that needs done before drywall can be installed. And I hope I can afford to contract that out. Will get bids as soon as I can but it won't be for 2-3 weeks.

Friday, August 26, 2011

No roof progress, bike parts ordered and in shipping,


Larry is working on my blue bike again, have condenser and points coming, and I am working in the attic every day..contractor has not been here for over a week, did send a letter..and will be looking at legal action if work does not get going and done...
Have an appointment with Hanger Prosthetic for custom work boot for damaged foot.
And there's a new guy in my life, he doesn't have a name yet but came with plenty of clothes and I also ordered 4 patterns his size, ok, so 2 were girl stuff but I do have a lot of dolls here and all like clothes.
I am working on the sub floor in the attic, the guy form work didn't do much but did it all wrong, glad he didn't use many screws to fasten it down, have most of them out and 2 pieces loose.
I might have help coming Saturday to work with me and I hope to get most of that sub floor down, stuff will have to be moved, take up what is down and done wrong, put it down right, move stuff I have stored up there, put down more sub floor..but at least I will be seeing some progress.
Overtime on this week's paycheck, nice to have a good paycheck, sure beats being on disability. I've worked hard to keep that damn accident from taking any more from me and from my life, my quality of life than I have absolutely had to give up.
I know the odds are high that I will not be able to work until retirement age but I am sure going to try and if that means big, ugly work boot that has supports up my lower leg, well, I can live with that.

Friday, August 19, 2011

no progesss on the roof..

This really is a contractor with licenses and good rep who does good work and in a timely manor. But that is not what is happening here. It took 4 days(plus weekend) to get the east side stripped and decked. It's been since Tuesday that anyone came and worked on the roof here. In the meantime I can't do work inside the attic and the house is so open that I have the air shut off, there is no reason to pay the bill to try and cool a house with this much draft issues.
I am trying to not let it stress me, I get upset, stressed and depressed and I spend $$ on stuff I don't need and sometimes later don't want..and right now I am spending a lot of time looking at big screen tv's on sale, and I don't have the place to put one until the attic is much closer to done.

I'm working late most night this week because Barb has called in 3 shifts in a row, so my foot and leg hurt more and all the time. That adds to my being unhappy with life..it's a no win circle right now, I am going to try and not let it drive me into any dark holes or have me wasting money that later I will regret.
But the high point is our annual company picnic is this Sunday, here in town and Larry and I are going..the first I have been able to attend in something like 4 years...
And the dog is not longer scratching himself until he has sores so the medication has helped that. I know life here has some rough spots but for the most part, it's workable and I like my life. I don't like this roof project and the long drawn out, not get the job started, get it finally started and then not get with the work and get it done stuff..but I will make another call, again, and hope that Monday I will have a crew here and the job will get completed and done right...

Wednesday, August 17, 2011

No more old houses

the roof job is finally started, 5+weeks after it was supposed to be started. Guy at work who said he knew how to do many things cannot lay sub floor correctly, he and another guy quit before they ruined much of my materials, what they did put down will have to be pulled up and put down correctly.
Foot hurts all the time, I am still getting medical bills that should have been paid with the settlement so will have to check on that, have already sent several bills to State Farm again, ones I know were part of that settlement.
Cami's facebook posts have me wondering if her mother is doing the same stuff to Cami that she did to me, over and over for years. I am staying away, staying here and keeping my life workable.
Looking at my house plans, attic project plans and trying to make wiring decisions for lighting and thinking on what I want for t.v. up there, how big, do I want to move the big 52" one from the living room up and then put something else down here, or do I want to buy a new flat screen for that attic space currently called "Jake's room"
I know it will be my retreat, I want to be able to sit and watch movies while I do hand work so lighting is an issue and so is what I have for t.v up there. I have to make wiring decisions before I insulate as I need to wire first. And so am working out ideas on paper now.
Life is livable but that damn accident keeps making ugly waves in my life. I know my foot will never get better, I know I will always have pain but thought by now I would quit getting medical bills from it. It's been more than a month, close to 2 months since the settlement date.
I will make a phone call after I get up and see if the one on my desk can be sorted out and hope it's their error. Damn place would not bill my medical insurance from work as they have agreement to take a lower amount..and now are charging a late fee..and I would not be surprised to learn they have been paid by State Farm and weeks ago...
Need to wind down and get some sleep, it's already after 3 am and I should have been asleep 2 hours ago--oh,ya I was still working 2 hours ago...

Tuesday, August 09, 2011

Still No contractor, made a phone call

We are a month behind the scheduled start, and he's still not here. The disposal bin is still empty and in my back yard, I still have a window in my living room, a spiral stair that cannot be installed and a serious lack of tolerance for 'Monday' and 'early next week' which has came and gone several weeks now.
Today's call again got his voice mail, today's message is that I need him to either get here and do the contracted job or refund my deposit and I will get someone else to do the job. This delay is fouling up my life.
Along with a huge chunk of my settlement funds, the other work I need done up there in the attic on hold for the most part, the garden has gone to weeds while I worked up in the attic to clean up the insulation so ceiling joices were ready for sub floor and stuff moved away from areas where work needed to be done.
I am stressed out to the max over this and my foot is in pain most of the time from work, I need this roof replaced, the dormer built, the spiral stair kit installed, the sub floor down, the wiring on end walls done, the insulation work done. And want it done this month..not next month, not next year.
And to top it off, I am getting calls from collection agencies looking for a man I have not see or heard from for more than 11 years, who never shared a home with me during our short marriage. He did not manage to scam me out of any amount of money, he did verbally abuse me and would have physically abused me if I had not gotten him out of my life when I did. I made a huge mistake trusting him, not seeing the man behind the mask, but I wasn't the stupid fool he thought I was, he never had his name on my home, vehicle or accounts that mattered, or access to much.
So, now it's been close to 12 years since I even heard his voice on a phone, I am getting collection agencies calling here, 2 in 2 days, looking for him.
He could be dead, I have no contact numbers, have not had, and I didn't really have that when I thought we were trying to make a life together.
So, not my problem, calling me does not gain them anything,

and right now it's not even making waves in my pond, just find it funny...
Just when I think my life has problems and is a mess, I get calls from collection agencies looking for Ken Gean or for Michael Ferrin... guess my life has some issues and stuff I need to take care of but at this time I don't have collection agencies calling me because I am behind on payments, or have just not paid my bills and am trying to duck out on them.
And I will either see the contractor here and work being done or I will see my deposit back and give the job to Raffa and his crew. If necessary I will take legal action, not something I want to do, but I am not going to just 'give away' a huge chunk of my settlement funds.
Today I see the podiatrist and hopefully we start to find some ways to lessen my pain and walking issues with my damaged foot. I need to keep working, I need to get through my work shift and not be miserable long before the shift is done.
I will get the garden dealt with, will get the insulation and sub floor out of my truck and up into the attic, will get finished with the wiring on the north wall so it can be insulated, will finish the insulation work on the south attic wall that I do have started.
And I am making changes in the plans for the upstairs bathroom, it has to fit the space there, it will have to work with the old chimney for plumbing chute, and it has to work with the ceiling/roof angles. I have bath #2 on paper now, have not checked measurements to see how they work but will before I go to my Dr appointment.
I can handle a lower ceiling/slanted ceiling in the bathroom if I plan it out right. I want things a certain way but if it does not work, then I will change it and like the change.. It's planned to be 5 foot wide, and that should not need changed, but I might have to change what order things are, right now it's toilet, sink and shower across the west end..like that but not sure I have the height for the shower.. can move entire bath east and get it to work...got plenty of space to work with up there, but it's how much space am I willing to give to a bathroom and just where I am willing to have that space taken out.
well it's almost 9 am so I need to get busy or I won't be showered and at that appointment on time, it's at the clinic south of the library so at least it's not a far drive, can run the bike..like that idea...

Phone call, the contractor will have some guys here tomorrow to get started- - his rep is very good, his work is very good, I really don't want to have someone else do this work but Need it started and done...

Wednesday, July 27, 2011

construction delays and pain

sure have me dealing with depression now. I don't think it will last, and I do think the contractor will show up, know that there are delays and he's small, not a lot of crew. The heat issues are a huge problem for construction work, and we are not dropping much below 80 at nights right now so it's early when it's hard to work on roofs and such.
My foot is being miserable, as are my hands, and and knees and back, so my pain levels are high, and I am spending time on my bed resting instead of out in the garden or up in the attic with the wiring project. And I am working late right now, Barb is on vacation so I am staying to finish up.
I will get through this, the house will get a new roof, the dormer built and the spiral stair is now is shipping so it will be here before the dormer is built.
Finances are ok, I need to balance the checkbook, and I need to put some $$ on my lunch card at work but that means a trip somewhere, Save-A-Lot, Wal-Mart, but sure am not getting it done.
I am getting the laundry taken care of, and I will turn the water on when I get home tonight so that will help the garden out. And I will try and do better, and I will plan to go to Springfield Friday as need to get x-rays sent or on disk for my doctor appointemnt..
I will be ok, just takes time, and I hope to see work done soon.

Monday, July 18, 2011

Construction delays still

But the work on central air starts early Tuesday/tomorrow morning, and I hope the work on the roof and dormer start soon too. I have the dormer window in the living room, the pipe to make the soil stack outside, have started taking things off the shelves, my dolls and other stuff I collect, moved some stuff in the attic where the new dormer goes, moved the antique chest of drawers that was living between the kitchen door and the bathroom wall, where the dormer will be going, so now my house gets to become a worse and worse mess. No place to put things, no place to store things and no room here.
It will get worse before it gets better so the sooner it is started, the sooner I can start putting the house back in order, clean up all the dirt and dust that gets knocked loose, and start work up in the studio, wiring, insulation, subfloor, and the spiral stairs will be here in just a couple weeks.
I need to balance the bank account again, need to pay a few bills again, need to run some errands tomorrow or Wed. and I need to mow again.
I am making progress on the garden weeds, I am almost done with reweaving the cane back in my rocker, have cane ordered and it should be in shipping now, this time I ordered a full bundle so will finish up this chair and store the rest.
It's ok to be back at work, my vacation was frustrating at times because I expected to see work being done here, be doing some of that clean up, go back to work with a good start on the attic studio, the central air done and be planning out the future upstairs bathroom.
My life here is pretty good, I won't say it's perfect, there's a few rough spots, some things that go hard that I don't often mention or write about..but I keep finding a way to see the light at the end of the tunnel, or find a blessing amongst the rocks and thorns.
This house might not ever be finished, this place might always be a renovation in progress but it's my renovation, and my little corner of the world and it works for me. I make a point of making it work, and I put in the sweat equity and the dollars that it takes to make it work.
Morning will start early, know the dog will have my up early and the air cond guys will be here early too, by 7:30 or so if the message on the answering machine is right..oh, great, Julie gets the window units and I get windows I can see out of and a quieter house!!! Ya, I like that idea...

Tuesday, July 12, 2011

construction delays here

Well, the air was to be done this week,now I expect them tomorrow, the contractor for roof and dormer was hoping to start here Monday, the 11th but first rain and now our heat wave has slowed him a week and he might be here Friday but the 18th is more likely.
I am on vacation this week, the rubbish bin is here now, I pouted yesterday after talking to my contractor and then curled up on Larry's couch and took a nap. It didn't change any thing much but I will do what I can this week, I can work on the wiring that needs done on both the north and south end walls, I can insulate those walls or at least get started on that. I can pull out some of the insulation that has gotten wet with the leaking roof problems and dispose of that. I can work to move some of my stuff stored up in that attic so it's more out of the way for the crew.
I can still work on the weeds in the garden, I will still have the mowing and watering to do and I still have Darrell's doctor appointment Thursday morning in Springfield as he is not to drive himself until after that appointment.
So, today Larry and did his blood work in Rushville, took cucumbers and beans to his sister, went to breakfast with her and husband, went to check out camp grounds in the area, went to Dot Foods, late lunch and came home and so from 8 am until after 3 p.m.I had Larry entertaining me.
Now I have picked the squash, sprayed the plum trees for the Japanese beetles and the squash for the squash bugs, looked at the tomatoes and paid my bike insurance bill.
I need to make a Wal-Mart run and also buy stamps so will do the stamps tomorrow as I have a letter with medical bills to send to State Farm, these should have been paid last month with the settlement and I bet they were but the accounts are not up to date. They were on the list of what was being paid out when we did the settlement paperwork.
I can buy some of what I need for the electrical work in the attic at Wal-Mart and get started with it instead of waiting until I go to Springfield, that will help me feel i am not totally wasting my vacation time.
I'm making knitting progress on Jake's socks but not on my purple sweater. I have to do the repairs on the old crochet bedspread I am sending to my aunt, she will enjoy it far more than I will and it was a great auction find.
I can also work on the caning replacement for the back of the rocker that was last summer's auction treasure. I have a lot of the materials needed so can start and order what I need, work until I run out and finish up after the materials come.
So, I don't need to pout or be screaming bored with my vacation. I might not be getting my new roof but I will be getting stuff done here that does need done.
Larry knows and laughs about the word 'relax' being my least favorite work in the English language.
Now it's not yet 5 p.m. and getting dark, so we might get some rain, it's needed and would help break the heat wave. My house is staying comfortable with what my kitchen window unit puts out but Larry's trailer gets miserable by afternoon and it's late at night before it really starts to cool off. Heart conditions do not tolerate real cold or hot and humid very well.

Sunday, July 03, 2011

3 Day weekend and it's hot and dry so far. ..

Larry and I went to a family reunion picnic yesterday, his mother's side and out rural in a tiny town that's slowly shrinking away. I did start the day with watering the garden and picking the green beans.
Today I tried on the way too large bike cover, I can alter it and for $20 including shipping I can make it fit, the cost was less than buying the fabric and making 1 from scratch. It's now marked and on my bed, I might get that done today, I can't be outside long working on the weeds as the heat index is already high and it's not 10 am yet.
I finally finished the pair of blue socks I have been working on for months, they are mine and not a priority. I am making very slow progress on the purple sweater, I have it done to the sleeves and they knit down from the shoulder. I think they are about 1/2 of the length they need to be so they have grown some but at 8-10 rows an inch I can knit a long time and not see any amount of progress on the sleeves. It will be done before it's cold enough to wear it.
Larry is working on my little blue bike again, he's not sure what the problem is but I think part is for his own entertainment, good thing I have the red bike to ride..
He will resolve it's problems, if needed I will order parts for it and he will get it back together and running.
So, next week the house gets air and I get price quotes for air/heat in the attic, the week after that I am on vacation while the work on the roof gets started.
It will allow the crew to work later as I won't have to leave for work and I will be on hand if needed and to help with daily clean up, and I will hopefully get some work done outside that has been put off too long. All the flowerbeds here need work so it's not just the garden that has a weed and grass problem I need to deal with.
But I am doing far better than I was this time last year. I am back at work, I have gained a lot more walking ability and I AM NOT INVOLVED WITH a very dishonest man who has huge financial problems, I am still getting calls from collection agencies looking for him. I also get them for my oldest son, the people who used to own this house and who ever had my cell phone ## before I got it, normal problem with pre-paid cell phones but part of the small annoyances in life.
But I hope that man in Utah gets his creditors to leave me alone, it's hard for me to have a good opinion or him with stuff like this happening several times a month.
Well, I need to head back out and deal with some more of those garden weeds as I have a lot out there I want done in the next few days

Wednesday, June 29, 2011

Almost July

and we are having sunshine and temps up in the mid 80's so it actually feels like summer now.
A 3 day weekend, we have a family picnic Saturday and I hope to work on the weeds in the garden and on my blue bike. I still need to resolve it's fuel problem, think moisture in the fuel or dirty gas.
Work is going ok, have a week of vacation coming when we start work on the house in mid-July. I am looking forward to not having window air unit running and making noise. A quieter house, more comfortable and in time lower utility bills will sure be great improvement, along with that replaced roof so I don't deal with leaking roofs and all that brings.
I will pay some bills on line in the morning and also call and make arrangements for the roof disposal, want to know we will have the dumpster/roll off here when the work starts or before.
I drooled over wood floors on line today before work and priced sub-floor, will have that sub floor but not sure I will ever be able to afford the wood floor I would like but sure saw some nice flooring.
1 of the women in our dept got the maint. planner/kitting job so that put her job up to bid, I hope to get it and be permanent instead of temp so bid for the opening.
i am watching finances tightly so that my settlement goes as far as possible on this old house and the work I need or want done but get tempted by techie stuff and dolls, good thing I am too busy to go to Best Buys and play right now. .. .

Thursday, June 23, 2011

Shopping for stairs

I have been shopping for stairs, spiral stair kits to be exact, as that is what will be installed for access to my attic. And I did not know there were so many out there, but have several price quotes and will get the stair kit ordered. It might not be here when the job starts but it will show up and get installed.
Both my air cond. guy and my roof/dormer guy were here today, and I have busy July coming up, and will take a week of vacation time when the roof/dormer contractor is here.
I have to arrange the refuse bin we will need,and I have to figure out where to put everything I have sitting on shelves now while the work is being done.
Once the air is done I get rid of the window units and loose that noise, once the roof is done I will get to enjoy a dry house and know it won't be long before the dehumidifier quits running all the time and I will start hearing the noises from the train instead of all the noise from things running in the house.
there is going to be a lot of work going on here for the summer, and possibly this fall and winter.
And in the meantime I have to change oil in my little bike, and work in the garden. We have a picnic thing Sunday with Larry's family, but I do not have this coming or next weekend planned out and will have time to catch up on a few things needing done around here, like weed the garden...

Tuesday, June 21, 2011

great Weekend

I will get photos posted but not this minute...Larry and I had a great weekend, didn't let the rain bother us, stayed until Monday morning, had sun all Sunday afternoon and evening so ran around on our bikes, walked a bit, Larry visited with 1 of the camp hosts, someone he has known for many years, I went riding while the guys chatted and caught up.
Today was busy, business in Springfield, and did find the locksmith there could and did make me spare up keys for my little bikes, and for $2 per key which sure beats paying $9 for a blank, plus postage and then paying to have the key cut. That was the on line seller I found who would have gladly sold me the same key blanks the local locksmith had. I did try the ones for the blue bike and they work just fine..
And I signed the contract with Brannon's for the central air, that will be done within 3 weeks, probably within 2, depends on when the parts all come in, someone will be here Thursday to let me know more and also look at what I want for the attic studio, and then work up some options and prices for me.
I got 2 deck materials costs, 1 for pressure treated, 1 for composite, think deck will be support and frame/joices and then deck it a few boards at a time as paycheck allow...composite is just over double the cost of pressure treated, so that would help me work the higher cost and better/lower maint material into the project...
Busy day tomorrow, and plans for the weekend, several auctions in Virginia I want to check out and might go to Springfield with Julie and do some things there, Larry thinks a 'girl' day would be good for me, or more like he does not want to be drug around all day while I play...LOL, he's smart enough to know I will be going like a 5year old on an all day sugar high.