My new ride, Fraelsi

My new ride, Fraelsi
Fraelsi means Freedom in Farose

Monday, April 06, 2015

Getting into April

We are warming up some and things are turning green, daffies are blooming and I really need to get the mower started.  Ben is getting the pampas grass cut down and we are using it for ground cover in areas that are bare and I have started to clean up the flower beds.
Work is going ok, I am qualified on the trim necks job now but the last 2 shifts I have worked a CCP job looking for contamination just after the hogs come out of the auto back saws.  And I don't get covered in blood, not complaining about it.
I am getting some doll knitting done and a bit of sewing and this past weekend I tidied up some of the doll things I had out that do have places to be stored.  I need to clean out something so I have storage for the doll wigs so they can stay tidy and I am working on a doll wardrobe trunk for the Wiggs clothing.  I need to put a 2nd bar in and have reinforced the area, have the dowel so just need to drill a hole and then glue the dowel in place.  I am not sure where I put those dowels but I know they are in my sewing space.
The doll club meeting has been moved from this coming Sunday to the next one, I had plans to buy 25# of flour at GFS while in Springfield but might be changing my schedule for that.  No reason to run to Springfield on a Sunday if we don't have a doll club meeting.
And I need to get started with the electrical work in what someday should become the upstairs bathroom, do what wiring I can get done and see about getting up at least 1 piece of water resistant drywall.  And get what I can done before it heats up, the more drywall I can get installed in the attic, the more energy efficient it will be.
And it is almost bedtime already, my evenings go so fast after I get home from work.